Smart Grid
Smart Grid
-
Technical committeeTypeAcronymIEC 62056-3-1:2013CommitteePublished year2013Description
IEC 62056-3-1:2013 describes three profiles for local bus data exchange with stations either energized or not. For non-energized stations, the bus supplies energy for data exchange. Three different profiles are supported: - base profile; - profile with DLMS; - profile with DLMS/COSEM. The three profiles use the same physical layer and they are fully compatible, meaning that devices implementing any of these profiles can be operated on the same bus. The transmission medium is twisted pair using carrier signalling and it is known as the Euridis Bus. This first edition cancels and replaces the first edition of IEC 62056-31, issued in 1999, and constitutes a technical revision. The main technical changes are: - addition of a profile which makes use of the IEC 62056 DLMS/COSEM Application layer and COSEM object model, - review of the data link layer which is split into two parts: a pure Data Link layer; a "Support Manager" entity managing the communication media; - ability to negotiate the communication speed, bringing baud rate up to 9 600 bauds.
Technology -
Technical committeeTypeAcronymIEC 62056-21:2002CommitteePublished year2002Description
Describes hardware and protocol specifications for local meter data exchange. In such systems, a hand-held unit (HHU) or a unit with equivalent functions is connected to a tariff device or a group of devices. This publication is of high relevance for Smart Grid.
Technology -
Technical committeeTypeAcronymIEC 62056-1-0:2014CommitteePublished year2014Description
IEC 62056-1-0:2014 provides information on the smart metering use cases and on architectures supported by the IEC 62056 DLMS/COSEM series of standards specifying electricity meter data exchange. It describes the standardization framework including: - the principles on which the standards shall be developed; - the ways the existing standards shall be extended to support new use cases and to accommodate new communication technologies, while maintaining coherency; - the aspects of interoperability and information security. It also provides guidance for selecting the suitable standards for a specific interface within the smart metering system.
Technology -
Technical committeeTypeAcronymIEC 62053-61:1998CommitteePublished year1998Description
Applies only to newly manufactured "combined meters", measuring more than one type of electric energy (e.g. active and reactive) and meters integrating additional functions which are not in the scope of IEC 60687, IEC 61036, IEC 61268 standards; these additional functions, all related to electric energy metering are maximum demand indicator, time switches, ripple control or radio receivers, etc. This publication is of high relevance for Smart Grid.
Technology -
Technical committeeTypeAcronymIEC 62053-52:2005CommitteePublished year2005Description
Applies to letter and graphical symbols intended for marking on and identifying the function of electromechanical or static a.c. electricity meters and their auxiliary devices.The symbols specified in this standard shall be marked on the name-plate, dial plate, external labels or accessories, or shown on the display of the meter as appropriate. This publication is of high relevance for Smart Grid.
Technology -
Technical committeeTypeAcronymIEC 62053-31:1998CommitteePublished year1998KeywordsDescription
Applies to passive, two-wire, externally powered pulse output devices to be used in electricity meters as defined by the relevant standards of technical committee 13 as well as future standards for static VA-hour meters. Such pulse output devices are used to transmit pulses to a receiver (e.g. a tariff device). This publication is of high relevance for Smart Grid.
Technology -
Technical committeeTypeAcronymIEC 62053-24:2020CommitteePublished year2020Description
IEC 62053-24:2020 applies only to static var-hour meters of accuracy classes 0,5S, 1S, 1, 2 and 3 for the measurement of alternating current electrical reactive energy in 50 Hz or 60 Hz networks and it applies to their type tests only. This document uses a conventional definition of reactive energy where the reactive power and energy is calculated from the fundamental frequency components of the currents and voltages only. This document applies to electricity metering equipment designed to: • measure and control electrical energy on electrical networks (mains) with voltage up to 1 000 V AC; • have all functional elements, including add-on modules, enclosed in, or forming a single meter case with exception of indicating displays; • operate with integrated or detached indicating displays, or without an indicating display; • be installed in a specified matching socket or rack; • optionally, provide additional functions other than those for measurement of electrical energy. Meters designed for operation with low power instrument transformers (LPITs as defined in the IEC 61869 series) may be considered as compliant with this document only if such meters and their LPITs are tested together and meet the requirements for directly connected meters. This document does not apply to: • meters for which the voltage line-to-neutral derived from nominal voltages exceeds 1 000 V AC; • meters intended for connection with low power instrument transformers (LPITs as defined in the IEC 61869 series) when tested without such transformers; • metering systems comprising multiple devices (except LPITs) physically remote from one another; • portable meters; • meters used in rolling stock, vehicles, ships and airplanes; • laboratory and meter test equipment; • reference standard meters; • data interfaces to the register of the meter; • matching sockets or racks used for installation of electricity metering equipment; • any additional functions provided in electrical energy meters. This document does not cover measures for the detection and prevention of fraudulent attempts to compromise a meter’s performance (tampering). This second edition cancels and replaces the first edition published in 2014 and its amendment 1:2016. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: see Annex E
Technology -
Technical committeeTypeAcronymIEC 62053-24CommitteePublished year2014KeywordsDescription
IEC 62053-24:2020 applies only to static var-hour meters of accuracy classes 0,5S, 1S, 1, 2 and 3 for the measurement of alternating current electrical reactive energy in 50 Hz or 60 Hz networks and it applies to their type tests only.
This document uses a conventional definition of reactive energy where the reactive power and energy is calculated from the fundamental frequency components of the currents and voltages only.
This document applies to electricity metering equipment designed to:
• measure and control electrical energy on electrical networks (mains) with voltage up to 1 000 V AC;
• have all functional elements, including add-on modules, enclosed in, or forming a single meter case with exception of indicating displays;
• operate with integrated or detached indicating displays, or without an indicating display;
• be installed in a specified matching socket or rack;
• optionally, provide additional functions other than those for measurement of electrical energy.
Meters designed for operation with low power instrument transformers (LPITs as defined in the IEC 61869 series) may be considered as compliant with this document only if such meters and their LPITs are tested together and meet the requirements for directly connected meters.
This document does not apply to:
• meters for which the voltage line-to-neutral derived from nominal voltages exceeds 1 000 V AC;
• meters intended for connection with low power instrument transformers (LPITs as defined in the IEC 61869 series) when tested without such transformers;
• metering systems comprising multiple devices (except LPITs) physically remote from one another;
• portable meters;
• meters used in rolling stock, vehicles, ships and airplanes;
• laboratory and meter test equipment;
• reference standard meters;
• data interfaces to the register of the meter;
• matching sockets or racks used for installation of electricity metering equipment;
• any additional functions provided in electrical energy meters.
This document does not cover measures for the detection and prevention of fraudulent attempts to compromise a meter’s performance (tampering).
This second edition cancels and replaces the first edition published in 2014 and its amendment 1:2016. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition: see Annex E -
Technical committeeTypeAcronymIEC 62053-21:2020CommitteePublished year2020KeywordsDescription
IEC 62053-21:2020 applies only to static watt-hour meters of accuracy classes 0,5, 1 and 2 for the measurement of alternating current electrical active energy in 50 Hz or 60 Hz networks and it applies to their type tests only.
This document applies to electricity metering equipment designed to:
• measure and control electrical energy on electrical networks (mains) with voltage up to 1 000 V AC;
• have all functional elements, including add-on modules, enclosed in, or forming a single meter case with exception of indicating displays;
• operate with integrated or detached indicating displays, or without an indicating display;
• be installed in a specified matching socket or rack;
• optionally, provide additional functions other than those for measurement of electrical energy. -
Technical committeeTypeAcronymIEC 62053-21CommitteePublished year2003KeywordsDescription
IEC 62053-21:2020 applies only to static watt-hour meters of accuracy classes 0,5, 1 and 2 for the measurement of alternating current electrical active energy in 50 Hz or 60 Hz networks and it applies to their type tests only.
This document applies to electricity metering equipment designed to:
• measure and control electrical energy on electrical networks (mains) with voltage up to 1 000 V AC;
• have all functional elements, including add-on modules, enclosed in, or forming a single meter case with exception of indicating displays;
• operate with integrated or detached indicating displays, or without an indicating display;
• be installed in a specified matching socket or rack;
• optionally, provide additional functions other than those for measurement of electrical energy.
Meters designed for operation with low power instrument transformers (LPITs as defined in the IEC 61869 series) may be tested for compliance with this document only if such meters and their LPITs are tested together and meet the requirements for directly connected meters.
This document does not apply to:
• meters for which the voltage line-to-neutral derived from nominal voltages exceeds 1 000 V AC;
• meters intended for connection with low power instrument transformers (LPITs as defined in the IEC 61869 series) when tested without such transformers;
• metering systems comprising multiple devices (except LPITs) physically remote from one another;
• portable meters;
• meters used in rolling stock, vehicles, ships and airplanes;
• laboratory and meter test equipment;
• reference standard meters;
• data interfaces to the register of the meter;
• matching sockets or racks used for installation of electricity metering equipment;
• any additional functions provided in electrical energy meters.
This document does not cover measures for the detection and prevention of fraudulent attempts to compromise a meter’s performance (tampering).
This second edition cancels and replaces the first edition published in 2003 and its amendment 1:2016. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
a) Removed all meter safety requirements; the meter safety requirements are covered in IEC 62052-31: 2015.
b) Replaced Ib with In; Ib is no longer used when referencing directly connected meters.
c) Moved the descriptions of all general requirements and test methods from IEC 62053-21: 2003, IEC 62053-22: 2003, IEC 62053-23: 2003, IEC 62053-24: 2003 to IEC 62052-11:2020; IEC 62053-21:2020, IEC 62053-22:2020, IEC 62053-23:2020, IEC 62053-24:2020 contain only accuracy class specific requirements.
d) Added new requirements and tests concerning:
1) measurement uncertainty and repeatability (7.3, 7.8);
2) influence of fast load current variations (9.4.12);
3) immunity to conducted differential current disturbances in the 2 kHz to 150 kHz frequency range (9.3.8).
e) Meters designed for operation with low power instrument transformers (LPITs) may be tested for compliance with this document as directly connected meters.