European Commission
JRC Smart Electricity Systems

  • STATUS: Permitted
  • Power: 84 MW
  • Capacity: 358 MWh
  • Duration: 4.26 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Poland(Poland)
Region
Silesian
Second Level
Poland
Coordinates (lat,lon):
50.260000 , 19.020000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 100 MW
  • Capacity: 200 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Latvia(Latvia)
Region
Liepaja
Second Level
Latvia
Coordinates (lat,lon):
56.540000 , 21.050000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 0.18 MW
  • Capacity: 0.4 MWh
  • Duration: 2.26 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Saxony-Anhalt
Second Level
Germany
Coordinates (lat,lon):
51.980000 , 10.990000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 35 MW
  • Capacity: 69.9 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Romania(Romania)
Region
Mures
Second Level
Romania
Coordinates (lat,lon):
46.420000 , 24.770000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 0.6 MW
  • Estimated Capacity: 4.8 MWh
  • Duration: 8 hours
  • Units: 1
Technology and subtechnology
MECHANICAL | Pumped Hydro Storage (PHS)

Facility

Country
Sweden(Sweden)
Region
Jamtland
Second Level
Sweden
Coordinates (lat,lon):
63.540000 , 12.750000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Inactive
  • Power: 35 MW
  • Capacity: 35 MWh
  • Duration: 1 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
France(France)
Region
Corsica
Second Level
France
Coordinates (lat,lon):
46.560000 , 2.550000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 2.42 MW
  • Capacity: 4.73 MWh
  • Duration: 1.95 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium iron phosphate battery (LFP)

Facility

Country
Latvia(Latvia)
Second Level
Latvia
Coordinates (lat,lon):
57.530000 , 25.410000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to