European Commission
JRC Smart Electricity Systems

  • STATUS: Announced
  • Power: 13.25 MW
  • Capacity: 60.19 MWh
  • Duration: 4.54 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Spain(Spain)
Region
Valencia
Second Level
Spain
Coordinates (lat,lon):
39.320000 , -0.750000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 565 MW
  • Capacity: 2260 MWh
  • Duration: 4 hours
  • Units: 2
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Romania(Romania)
Region
Sibiu
Second Level
Romania
Coordinates (lat,lon):
45.800000 , 24.140000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Under construction
  • Power: 56 MW
  • Capacity: 112 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium iron phosphate battery (LFP)

Facility

Country
Germany(Germany)
Region
Lower Saxony
Second Level
Germany
Coordinates (lat,lon):
53.170000 , 10.240000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 0.01 MW
  • Estimated Capacity: 0.12 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
MUHOS(Finland)
Second Level
MUHOS
Coordinates (lat,lon):
64.961900 , 26.013300
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Operational
  • Power: 0.8 MW
  • Estimated Capacity: 16 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
Landkreis Heilbronn(Germany)
Second Level
Landkreis Heilbronn
Coordinates (lat,lon):
49.264473 , 0.004345
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
Subscribe to