European Commission
JRC Smart Electricity Systems

  • STATUS: Operational
  • Power: 0.05 MW
  • Estimated Capacity: 0.94 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
SAINT-MALO(France)
Second Level
SAINT-MALO
Coordinates (lat,lon):
48.647200 , -2.021700
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Operational
  • Power: 0.06 MW
  • Estimated Capacity: 1.25 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
Landkreis Alzey-Worms(Germany)
Second Level
Landkreis Alzey-Worms
Coordinates (lat,lon):
49.743300 , 8.117800
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Operational
  • Power: 0.04 MW
  • Estimated Capacity: 0.76 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
ROMA(Italy)
Second Level
ROMA
Coordinates (lat,lon):
41.872900 , 12.496400
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Inactive
  • Power: 30 MW
  • Capacity: 30 MWh
  • Duration: 1 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
I-SEM(Ireland)
Region
Leinster
Second Level
I-SEM
Coordinates (lat,lon):
53.290000 , -7.520000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to