European Commission
JRC Smart Electricity Systems

  • STATUS: Permitted
  • Power: 48.25 MW
  • Capacity: 193.01 MWh
  • Duration: 4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Poland(Poland)
Second Level
Poland
Coordinates (lat,lon):
52.190000 , 19.360000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 130 MW
  • Estimated Capacity: 260 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Czechia
Region
Moravian-Silesian
Coordinates (lat,lon):
49.900000 , 17.640000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 25 MW
  • Capacity: 100 MWh
  • Duration: 4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Belgium(Belgium)
Region
Antwerp
Second Level
Belgium
Coordinates (lat,lon):
50.770000 , 3.480000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 30 MW
  • Capacity: 400 MWh
  • Duration: 13.33 hours
  • Units: 1
Technology and subtechnology
THERMAL | Unspecific Sensible Thermal Energy Storage (STES)

Facility

Country
Finland(Finland)
Region
South Savo
Second Level
Finland
Coordinates (lat,lon):
61.670000 , 27.290000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 45 MW
  • Capacity: 91.44 MWh
  • Duration: 2.03 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Romania(Romania)
Region
Mures
Second Level
Romania
Coordinates (lat,lon):
46.450000 , 24.350000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 6.7 MW
  • Capacity: 6.7 MWh
  • Duration: 1 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Great Britain(United Kingdom)
Region
England
Second Level
Great Britain
Coordinates (lat,lon):
51.910000 , 0.590000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to