European Commission
JRC Smart Electricity Systems

  • STATUS: Operational
  • Power: 0.5 MW
  • Capacity: 4.2 MWh
  • Duration: 8.4 hours
  • Units: 1
Technology and subtechnology
THERMAL | Unspecific Sensible Thermal Energy Storage (STES)

Facility

Country
Germany(Germany)
Region
Saarland
Second Level
Germany
Coordinates (lat,lon):
49.240000 , 7.000000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Under construction
  • Power: 2 MW
  • Capacity: 20 MWh
  • Duration: 10 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Redox flow batteries Vanadium

Facility

Country
Germany(Germany)
Region
Baden-Wurttemberg
Second Level
Germany
Coordinates (lat,lon):
49.020000 , 8.520000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 203.7 MW
  • Capacity: 814.7 MWh
  • Duration: 4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Poland(Poland)
Region
Silesian
Second Level
Poland
Coordinates (lat,lon):
50.310000 , 18.790000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 5.02 MW
  • Capacity: 4.01 MWh
  • Duration: 0.8 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Bavaria
Second Level
Germany
Coordinates (lat,lon):
48.190000 , 11.440000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 7.5 MW
  • Capacity: 33.02 MWh
  • Duration: 4.4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Poland(Poland)
Region
Lower Silesian
Second Level
Poland
Coordinates (lat,lon):
51.100000 , 17.040000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 2.5 MW
  • Capacity: 2.5 MWh
  • Duration: 1 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Germany(Germany)
Region
Bavaria
Second Level
Germany
Coordinates (lat,lon):
49.550000 , 10.050000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to