Details
- Publication Category:
- Reports
- Research Area:
- Integrated power systems
The JRC reviewed existing flexibility assessments in the literature based on what outcomes they produce. Based on this review, we propose that Flexibility Needs Assessments in Europe should assess three key areas: renewable integration, ramping needs and reserve requirements.
What results should Flexibility Needs Assessments in the power sector produce?
Final Agenda - CoC Phase 2 - First Workshop - 18 SEP 2024
4.1 Trialog - IOP Standards & CoC Ontology Tester - Antonio Kung
3.4 S2 Standard - New Use Case - Mente Konsman
3.3 ETSI - SAREF European Norm (EN) - Joachim Koss
3.2 HCA - Mapping new example to SAREF in Annex 3 CoC v.1.0 - Michael Siemann
3.2 CSA - Mapping new example to SAREF in Annex 3 CoC v.1.0 - James Harrow