Technical committeeTypeAcronymIEC 62264-6CommitteePublished year2020Description
IEC 62264-6:2020(E) defines a technology independent model for a set of abstract services that is located above the application layer of the OSI model, and that is used for exchanging transaction messages based on the transaction models defined in IEC 62264-5. The model, which is called the Messaging Service Model (MSM), is intended for interoperability between manufacturing operations domain applications and applications in other domains.
-
Technical committeeTypeAcronymIEC 62264-5CommitteePublished year2011Description
IEC 62264-5:2016 defines transactions in terms of information exchanges between applications performing business and manufacturing activities associated with Levels 3 and 4. The exchanges are intended to enable information collection, retrieval, transfer and storage in support of enterprise-control system integration. This part of IEC 62264 is consistent with the IEC 62264-2 and IEC 62264-4 object models attributes. This standard also defines transactions that specify how to exchange the objects defined in IEC 62264-2, IEC 62264-4 and this standard. This second edition cancels and replaces the first edition published in 2011. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: The addition of transaction rules for objects defined in IEC 62264-4: Job, Job List, Job Response, Job Response List, Work Alert Definition, Work Alert, Work Calendar Definition, Work Calendar, Work Capability Work Directive, Work Master, Work Performance, Work Record, Work Schedule, Workflow Specification Node Type, Workflow Specification. It is published as a double logo standard.
-
Technical committeeTypeAcronymIEC 62264-4CommitteeKeywordsDescription
IEC 62264-4:2015 defines object models and attributes exchanged between Level 3 manufacturing operations management activities defined in IEC 62264-3.
-
Technical committeeTypeAcronymIEC 62264-3CommitteePublished year2007Description
IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
a) 4.1 Manufacturing Operations Management was moved to Part 1 and therefore was removed from Part 3;
b) 4.2 Functional hierarchy was moved to Part 1 and therefore was removed from Part 3;
c) 4.4 Criterion for defining activities below Level 4 was moved to Part 1 and therefore was removed from Part 3;
d) 4.5 Categories of production information was moved to Part 1 and therefore was removed from Part 3;
e) 4.6 Manufacturing operations information was moved to Part 1 and therefore was removed from Part 3;
f) 5.3 Expanded equipment hierarchy model was moved to Part 1 and therefore was removed from Part 3;
g) 5.4 Expanded decision hierarchy model was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704;
h) Annex A (informative) Other enterprise activities affecting manufacturing operations was moved to Part 1 and therefore was removed from Part 3;
i) Annex D (informative) Associated standards was moved to Part 1 and therefore was removed from Part 3;
j) Annex F (informative) Applying the decision hierarchy model to manufacturing operations management was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704;
k) Annex G (informative) Mapping PSLX ontology to manufacturing operations management was removed from Part 3. The committee felt that this section is more appropriate as a PSLX white paper or TR.
The names for data were changed to match the Part 4 standard names. These name changes were made in all figures and in the text. -
Technical committeeTypeAcronymIEC 62264-2CommitteePublished year2013KeywordsDescription
IEC 62264-2:2013 specifies generic interface content exchanged between manufacturing control functions and other enterprise functions. The interface considered is between Level 3 manufacturing systems and Level 4 business systems in the hierarchical model defined in IEC 62264-1. The goal is to reduce the risk, cost, and errors associated with implementing the interface. This second edition cancels and replaces the first edition published in 2004 and constitutes a technical revision. It includes the following technical:
- addition of object models for exchange information used in manufacturing operations management activities;
- displacement of the UML object models that were in IEC 62264-1:2003 into this standard so that the object models and the associated attribute tables were available in the same document;
- addition of the Hierarchy scope object definition to replace the Location attribute used in the previous edition;
- addition of a value type section to define the exchange of non-simple value types;
- definition of simple value types were defined using the ISO 15000-5. -
Technical committeeTypeAcronymIEC 62264-1CommitteePublished year2013Description
IEC 62264-1:2013 describes the manufacturing operations management domain (Level 3) and its activities, and the interface content and associated transactions within Level 3 and between Level 3 and Level 4. This description enables integration between the manufacturing operations and control domain (Levels 3, 2, 1) and the enterprise domain (Level 4). Its goals are to increase uniformity and consistency of interface terminology and reduce the risk, cost, and errors associated with implementing these interfaces. IEC 62264-1 can be used to reduce the effort associated with implementing new product offerings. This second edition cancels and replaces the first edition published in 2003. It constitutes a technical revision and includes the following significant technical changes with respect to the previous edition:
- the functional hierarchy in 5.2 was extended using the definitions from IEC 62264-3;
- the equipment hierarchy in 5.3 was extended using the definitions from IEC 62264-3;
- a physical asset equipment model was added in 5.3;
- the generic model of manufacturing operations management categories in Clause 7 was added using information from IEC 62264-3;
- the formal UML models that were in Clause 7 were moved to IEC 62264-2 and the remaining data definitions are now in Clause 8;
- the capacity and capability model in Clause 8 was extended;
- new Annexes A and B were moved from IEC 62264-3;
- Subclause 5.5 on the decision hierarchy was removed and a reference added to ISO 15704;
- Annex C, D, E were moved to a Technical Report;
- Annex F was removed. -
Technical committeeTypeAcronymIEC 62259:2003CommitteePublished year2003Description
This International Standard specifies marking, designation, dimensions, tests and require-ments for vented nickel-cadmium prismatic secondary single cells where special provisions have been made in order to have partial or, under very specific conditions, full gas recombination.
Technology -
Technical committeeTypeAcronymIEC 62257-9-6CommitteePublished year2019Description
IEC TS 62257-9-6 RLV contains both the official IEC International Standard and its Redline version. The Redline version is available in English only and provides you with a quick and easy way to compare all the changes between the official IEC Standard and its previous edition.
IEC 62257-9-6:2019 proposes a simple selection procedure and cheap, comparative tests which can be performed in laboratories of developing countries, in order to identify the most suitable model of small Photovoltaic Individual Electrification Systems (PV- IES) up to 500 Wp for a particular rural electrification project from a number of products submitted for test. The tests provided in IEC TS 62257-9-6 allow assessment of the performance of a PV-IES according to the requirement of the general specification of the project (see IEC/TS 62257-2) and to verify their ability to provide the required service. This second edition of IEC TS 62257-9-6 cancels and replaces the first edition published in 2008. The main technical changes with respect to the previous edition are as follows:
- Removal of the term "small" from the title of the publication and from description of rural electrification systems.
- Removal of the limits on system voltage and power; these recommendations apply to systems of all sizes. -
Technical committeeTypeAcronymIEC 62257-9-5CommitteePublished year2018Description
IEC TS 62257-9-5 RLV contains both the official IEC International Standard and its Redline version. The Redline version is available in English only and provides you with a quick and easy way to compare all the changes between the official IEC Standard and its previous edition.
IEC TS 62257-9-5:2018 applies to stand-alone renewable energy products. This document deals essentially with off-grid renewable energy products with batteries and solar modules with DC system voltages not exceeding 35 V and peak power ratings not exceeding 350 W. The tests contained herein are capable in many cases of adequately assessing systems at higher voltages and/or power ratings. This new edition includes the following significant technical changes with respect to the previous edition:
- replaced the term "stand-alone lighting kits" with "stand-alone renewable energy products" throughout the document (including the title) to reflect that the revised document is applicable to a broader range of products with a more diverse set of capabilities.
- added test methods for flooded lead-acid batteries.
- significantly revised the protection tests, assessment of DC ports, appliance tests, and energy service calculations based on field experience.
- revised the voltage operating points at which testing is carried out to better reflect actual operation and to simplify the procedures for testing products without lights.
- revised the energy service calculations to include the effect of multiple simultaneously connected loads on the port voltage and battery-to-port efficiency and to accommodate products with grid or electromechanical charging. -
Technical committeeTypeAcronymIEC 62257-9-4CommitteePublished year2016Description
IEC TS 62257-9-4(E) specifies the general requirements for the design and the implementation of a user's installation. It applies to single phase user's electrical installations with maximum power of 500 VA, in decentralized rural electrification systems. It is applicable to installations supplied by an AC microgrid and to installations encompassing their own single-unit AC micropower plant or DC micropower plant. The main technical changes with regard to the previous edition are as follows: changing the voltage range covered by the technical specification to AC nominal voltage below 1 000 V and DC nominal voltage below 1 500 V.