Power Systems Management and Associated Information Exchange
-
Technical committeeTypeAcronymIEC 61850-80-1CommitteePublished year2016Description
This technical specifiIEC TS 61850-80-1:2016(E) gives a guideline on how to exchange information from a CDC-based data model (for example IEC 61850) using IEC 60870-5-101 or IEC 60870-5-104 between substation(s) and control center(s). Mostly guidelines for functions needed in a substation gateway device are given. The goal of this technical specification is to describe standardized mapping of device-oriented data models (for example IEC 61850) with already defined attributes of CDCs and services (for example IEC 61850-7) onto the already defined ASDUs and services of IEC 60870-5-104 or IEC 60870-5-101. This second edition includes the following significant technical changes with respect to the previous edition: it makes reference to Edition 2 standards of the IEC 61850 series, more particularly to IEC 61850-7-3:2010, which introduces new Common Data Classes (CDCs).cation gives a guideline on how to exchange information from a CDCbased data model (for example IEC 61850) using IEC 60870-5-101 or IEC 60870-5-104 between substation(s) and control center(s). Mostly guidelines for functions needed in a substation gateway device are given.
-
Technical committeeTypeAcronymIEC 61850-8-2CommitteePublished year2018KeywordsDescription
EC 61850-8-2:2018 specifies a method of exchanging data through any kinds of network, including public networks. Among the various kinds of services specified in IEC 61850-7-2, only the client/server and time synchronization services are considered so far.
NOTE Client/server services of GOOSE and SMV models are mapped as well.
For the client/server services, the principle is to map the objects and services of the ACSI (Abstract Communication Service Interface defined in IEC 61850-7-2) to XML messages transported over XMPP. The mapping description includes mainly three aspects:
• The usage of the XMPP protocol itself, describing in details which features are really used and how they are used by the mapping.
• How to achieve end-to-end secured communications.
• The description of the XML payloads corresponding to each ACSI service thanks in particular to the XML Schema and XML message examples. -
Technical committeeTypeAcronymIEC 61850-8-1CommitteePublished year2011Description
IEC 61850-8-1:2011+A1:2020 specifies a method of exchanging time-critical and non-time-critical data through local-area networks by mapping ACSI to MMS and ISO/IEC 8802-3 frames. Defines a standardized method of using the ISO 9506 services to implement the exchange of data. For those ACSI services defined in IEC 61850-7-2 that are not mapped to MMS, this part defines additional protocols. It describes real utility devices with respect to their external visible data and behaviour using an object oriented approach. The objects are abstract in nature and may be used to a wide variety of applications. The use of this mapping goes far beyond the application in the utility communications. The main changes with respect to the previous edition are listed below:
- the support of gigabit Ethernet,
- the link layer redundancy,
- the extension of the length of the object reference,
- the extension of the reason for inclusion type for comprehensive logging,
- the mapping of the tracking services,
- a second mapping of the objectReference when used in the tracking services, or as linking,
- the extension of the AdditionalCause enumeration,
- the simulation of GOOSE telegram,
- the so-called fixed-length encoded GOOSE,
- the removal of the SCL Control Block.
This consolidated version consists of the second edition (2011) and its amendment 1 (2020). Therefore, no need to order amendment in addition to this publication. -
Technical committeeTypeAcronymIEC 61850-7-4:2010+AMD1:2020 CSV Consolidated versionCommitteePublished year2020KeywordsDescription
IEC 61850-7-4:2010+A1:2020 specifies the information model of devices and functions generally related to common use regarding applications in systems for power utility automation. It also contains the information model of devices and function-related applications in substations. In particular, it specifies the compatible logical node names and data object names for communication between intelligent electronic devices (IED). This includes the relationship between logical nodes and data objects. Major technical changes with regard to the previous edition are as follows: corrections and clarifications according to technical issues raised by the users' community; extensions for new logical nodes for the power quality domain; extensions for the model for statistical and historical statistical data; extensions regarding IEC 61850-90-1; extensions for new logical nodes for monitoring functions according to IEC 62271; new logical nodes from IEC 61850-7-410 and IEC 61850-7-420 of general interest.
-
Technical committeeTypeAcronymIEC 61850-7-420:2009CommitteePublished year2009KeywordsDescription
EC 61850-7-420:2009 defines IEC 61850 information models to be used in the exchange of information with distributed energy resources (DER), which comprise dispersed generation devices and dispersed storage devices, including reciprocating engines, fuel cells, microturbines, photovoltaics, combined heat and power, and energy storage. Utilizes existing IEC 61850-7-4 logical nodes where possible, but also defines DER-specific logical nodes where needed.
Technology -
Technical committeeTypeAcronymIEC 61850-7-420CommitteePublished year2009Description
IEC 61850-7-420:2009 defines IEC 61850 information models to be used in the exchange of information with distributed energy resources (DER), which comprise dispersed generation devices and dispersed storage devices, including reciprocating engines, fuel cells, microturbines, photovoltaics, combined heat and power, and energy storage. Utilizes existing IEC 61850-7-4 logical nodes where possible, but also defines DER-specific logical nodes where needed.
-
Technical committeeTypeAcronymIEC 61850-7-410:2012+AMD1:2015 CSVCommitteePublished year2015Description
IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. This consolidated version consists of the second edition (2012) and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.Technology -
Technical committeeTypeAcronymIEC 61850-7-410:2012+AMD1:2015 CSV Consolidated versionCommitteePublished year2015Description
IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows: the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010; the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated; most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510. This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.
-
Technical committeeTypeAcronymIEC 61850-7-410CommitteePublished year2012Description
IEC 61850-7-410 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows: - the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010; - the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated; - most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510. This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.
Technology -
Technical committeeTypeAcronymIEC 61850-7-4CommitteePublished year2010Description
IEC 61850-7-4:2010+A1:2020 specifies the information model of devices and functions generally related to common use regarding applications in systems for power utility automation. It also contains the information model of devices and function-related applications in substations. In particular, it specifies the compatible logical node names and data object names for communication between intelligent electronic devices (IED). This includes the relationship between logical nodes and data objects. Major technical changes with regard to the previous edition are as follows:
- corrections and clarifications according to technical issues raised by the users' community; extensions for new logical nodes for the power quality domain;
- extensions for the model for statistical and historical statistical data;
- extensions regarding IEC 61850-90-1;
- extensions for new logical nodes for monitoring functions according to IEC 62271;
- new logical nodes from IEC 61850-7-410 and IEC 61850-7-420 of general interest.
This publication is of core relevance for Smart Grid. This consolidated version consists of the second edition (2010) and its amendment 1 (2020). Therefore, no need to order amendment in addition to this publication.