TURBOmachinery REtrofits enabling FLEXible back-up capacity for the transition of the European energy system

Project dates: 01. Oct 2017 - 31. Mar 2021

Objective

The energy sector accounts for two thirds of the global CO2 emissions and is therefore crucial to ensure future green growth and to achieve the global emission reduction targets. Substantial reduction of CO2 emissions can only be achieved by large scale deployment of renewable energy sources, including in particular the most abundant energy sources, wind and sun. Their intermittent nature however poses significant challenges for the energy system as peak demand from the system and peak production form those intermittent sources do not overlap. As there are no large scale storage solutions available yet, other backup capacities are needed. The installed fossil capacity is large enough to provide this back-up power. However, the plants were designed for baseload operation, which results in increased wear and costs through cyclic operation and unnecessarily high emissions in the start-up phase. Providing technology upgrades to retrofit the installed power plants to enable flexible operation without penalties on life, cost and emissions is an opportunity to quickly provide the necessary backup capacity to keep the energy system stable and resilient and at the same time enabling higher renewable shares. TURBO-REFLEX will follow this approach and has selected technologies for retrofitting critical parts of thermal power plants which have already seen experimental proof-of-concept and are expected to significantly contribute to flexible operation. The technologies will reduce the minimum load, increase the ramp rates and reduce the costs per cycle. This will be achieved by new compressor designs for off-design operability, technologies in the hot gas path, in combustor and turbine, and by new materials, models and sensors to monitor and ensure the mechanical integrity in flexible operation. An integrated assessment will provide not only the technological but also the economic benefits for plant operators, thus ensuring a swift implementation of TURBO-REFLEX technologies.

Partners

Number of partners: 26
Site numbers:

COMTES FHT AS

LINKOPINGS UNIVERSITET

GENERAL ELECTRIC (SWITZERLAND) GMBH

TECHNISCHE UNIVERSITAET MUENCHEN

UNIVERSITA DEGLI STUDI DI FIRENZE

DOOSAN SKODA POWER SRO

  • Partner
  • Czech Republic
  • Budget: 500, 000

KAPELANCZYK PAWEL MICHAL

T - ELEKTRONIK SRO

DEUTSCHES ZENTRUM FUR LUFT - UND RAUMFAHRT EV

ASINCO GMBH

KARLSRUHER INSTITUT FUER TECHNOLOGIE

INSTYTUT MASZYN PRZEPLYWOWYCH IM ROBERTA SZEWALSKIEGO POLSKIEJ AKADEMII NAUK - IMP PAN

MITSUBISHI HITACHI POWER SYSTEMS EUROPE LTD

SIEC BADAWCZA LUKASIEWICZ-INSTYTUTLOTNICTWA

CESKE VYSOKE UCENI TECHNICKE V PRAZE

ARTTIC

  • Partner
  • ARTTIC
  • France
  • Budget: 308, 950

ANSALDO ENERGIA SWITZERLAND AG

UNIVERSITY OF STUTTGART

ZAPADOCESKA UNIVERZITA V PLZNI

SIEMENS ENERGY GLOBAL GMBH & CO. KG

CRANFIELD UNIVERSITY

MAN ENERGY SOLUTIONS SE

ANSALDO ENERGIA SPA

SIEMENS AKTIENGESELLSCHAFT

MITSUBISHI POWER EUROPE GMBH

NATURGY ENERGY GROUP SA

Key Exploitable Results

  • TRL

  • Effective use:
  • Barriers:
  • Additional next steps:
  • Investment needed: