VLab

Submitted by Ruth on Mon, 06/19/2023 - 06:06
VLab
  • Static Equipment:Digital Real-time Simulators: RTDS Simulator (8x Racks à 4 GPC cards,4x GTNET, 1x GTSYNC, 2x GTFPGA extension cards, licenses for all available IO protocols and highspeed Aurora links to HPC and OPAL targets) 1 OPAL-RT Simulator (1x OP5600 target with eHS
  • Technologies for the integrated grid:Don't know/No answer
  • Work on microgrids: Do you work on microgrids? No
  • Do you work with PMUs? No
  • Do you work on AMI? No
    • Power and voltage capabilities:
    • AC
    • DC
    • Total power installed (kW):
    • Peak power of the installed equipment(kW)
    • Voltage level (V))
  • Hardware in the Loop and Real Time simulations Do you work with Real Time Simulator? No
  • Testing Services:The main function of the ACS laboratory infrastructure is to support fast prototyping of control systems and derisk new control architectures for application in power systems. This is achieved through a set of real-time (RT) simulators and hardware interf