Improvement of the DER-TF (Distributed Energy Resource Test Facility)

Submitted by Ruth on Mon, 06/19/2023 - 06:06
Improvement of the DER-TF (Distributed Energy Resource Test Facility)
  • In opertation since:
  • Static Equipment:Vehicle-to-Grid charging station (15 kW each one, bidirectional) and a High temperature Nickel-Sodium energy storage system (19 kW – 56 kWh). In addition, the Low Voltage DC Microgrid was completed through the installation of a new AC/DC converter (30 kVA
  • Technologies for the integrated grid:Don't know/No answer
  • Work on microgrids: Do you work on microgrids? No
  • Do you work with PMUs? No
  • Do you work on AMI? No
    • Power and voltage capabilities:
    • AC
    • DC
    • Total power installed (kW):
    • Peak power of the installed equipment(kW)
    • Voltage level (V))
  • Hardware in the Loop and Real Time simulations Do you work with Real Time Simulator? No