European Commission
JRC Smart Electricity Systems

  • STATUS: Permitted
  • Power: 3.65 MW
  • Capacity: 14.64 MWh
  • Duration: 4.01 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Poland(Poland)
Region
Silesian
Second Level
Poland
Coordinates (lat,lon):
50.260000 , 18.860000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 188 MW
  • Estimated Capacity: 376 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Italy(Italy)
Region
Molise
Second Level
Italy
Coordinates (lat,lon):
41.750000 , 15.000000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 30 MW
  • Estimated Capacity: 60 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Italy(Italy)
Region
Basilicata
Second Level
Italy
Coordinates (lat,lon):
40.850000 , 16.030000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 11.4 MW
  • Capacity: 22.82 MWh
  • Duration: 2 hours
  • Units: 2
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Brandenburg
Second Level
Germany
Coordinates (lat,lon):
52.460000 , 12.340000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 300 MW
  • Capacity: 4800 MWh
  • Duration: 16 hours
  • Units: 1
Technology and subtechnology
MECHANICAL | Pumped Hydro Storage (PHS)

Facility

Country
Austria(Austria)
Region
Upper Austria
Second Level
Austria
Coordinates (lat,lon):
47.890000 , 14.260000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 4 MW
  • Capacity: 8 MWh
  • Duration: 2 hours
  • Units: 2
Technology and subtechnology
ELECTROCHEMICAL | Lithium iron phosphate battery (LFP)

Facility

Country
Denmark(Denmark)
Region
Zealand
Second Level
Denmark
Coordinates (lat,lon):
55.440000 , 11.800000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 85 MW
  • Capacity: 711 MWh
  • Duration: 8.36 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Greece(Greece)
Region
Eastern Macedonia and Thrace
Second Level
Greece
Coordinates (lat,lon):
39.010000 , 22.590000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to