European Commission
JRC Smart Electricity Systems

  • STATUS: Operational
  • Power: 15 MW
  • Capacity: 17.4 MWh
  • Duration: 1.16 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Germany(Germany)
Region
Lower Saxony
Second Level
Germany
Coordinates (lat,lon):
52.400000 , 9.680000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 42 MW
  • Estimated Capacity: 84 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Portugal(Portugal)
Second Level
Portugal
Coordinates (lat,lon):
39.600000 , -8.530000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 360 MW
  • Capacity: 22340 MWh
  • Duration: 62.06 hours
  • Units: 2
Technology and subtechnology
MECHANICAL | Pumped Hydro Storage (PHS)

Facility

Country
Austria(Austria)
Region
Tyrol
Second Level
Austria
Coordinates (lat,lon):
47.120000 , 11.870000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 1 MW
  • Capacity: 0.66 MWh
  • Duration: 0.66 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium nickel cobalt aluminium oxide battery (NCA)

Facility

Country
France(France)
Region
Ile-de-France
Second Level
France
Coordinates (lat,lon):
48.620000 , 3.040000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Inactive
  • Power: 212 MW
  • Estimated Capacity: 275.6 MWh
  • Duration: 1.3 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
I-SEM(Ireland)
Region
Leinster
Second Level
I-SEM
Coordinates (lat,lon):
53.160000 , -6.680000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to