STATUS:
Permitted
Power:
59.4 MW
Capacity:
139.97 MWh
Duration:
2.36
hours
Units:
3
Technology and subtechnology
ELECTROCHEMICAL
|
Unspecific Storage battery
Facility
Country
Spain(Spain)
Region
Valencia
Second Level
Spain
Coordinates (lat,lon):
39.160000
,
-4.100000
Disclaimer:
The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Disclaimer:
The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Disclaimer:
The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
STATUS:
Operational
Power:
0.8 MW
Capacity:
4.8 MWh
Duration:
6
hours
Units:
1
Technology and subtechnology
ELECTROCHEMICAL
|
Sodium Sulphur batteries
Facility
Country
Germany(Germany)
Second Level
Germany
Coordinates (lat,lon):
53.133300
,
8.066700
Disclaimer:
The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.