European Commission
JRC Smart Electricity Systems

  • STATUS: Operational
  • Power: 140 MW
  • Capacity: 4080 MWh
  • Duration: 29.14 hours
  • Units: 2
Technology and subtechnology
MECHANICAL | Pumped Hydro Storage (PHS)

Facility

Country
Austria(Austria)
Region
Carinthia
Second Level
Austria
Coordinates (lat,lon):
47.000000 , 13.060000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 1.2 MW
  • Capacity: 4.15 MWh
  • Duration: 3.46 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Sodium Nickel Chloride batteries

Facility

Country
Italy(Italy)
Region
Sicily
Second Level
Italy
Coordinates (lat,lon):
37.900000 , 13.560000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Inactive
  • Power: 2 MW
  • Capacity: 2.8 MWh
  • Duration: 1.4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium nickel manganese cobalt oxide battery (NMC)

Facility

Country
Germany(Germany)
Region
Hamburg
Second Level
Germany
Coordinates (lat,lon):
53.530000 , 9.960000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 300 MW
  • Capacity: 1200 MWh
  • Duration: 4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Poland(Poland)
Second Level
Poland
Coordinates (lat,lon):
52.190000 , 19.360000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 35 MW
  • Capacity: 100 MWh
  • Duration: 2.86 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Netherlands(Netherlands)
Region
Flevoland
Second Level
Netherlands
Coordinates (lat,lon):
52.580000 , 5.530000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 2.65 MW
  • Capacity: 2 MWh
  • Duration: 0.75 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Germany(Germany)
Region
Schleswig-Holstein
Second Level
Germany
Coordinates (lat,lon):
54.830000 , 8.900000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 0.6 MW
  • Capacity: 1.29 MWh
  • Duration: 2.15 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Bavaria
Second Level
Germany
Coordinates (lat,lon):
50.310000 , 10.960000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to