European Commission
JRC Smart Electricity Systems

  • STATUS: Announced
  • Power: 4 MW
  • Capacity: 8 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Bavaria
Second Level
Germany
Coordinates (lat,lon):
49.610000 , 10.180000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 22.5 MW
  • Capacity: 82.5 MWh
  • Duration: 3.67 hours
  • Units: 2
Technology and subtechnology
THERMAL | Unspecific Sensible Thermal Energy Storage (STES)

Facility

Country
Spain(Spain)
Region
Andalusia
Second Level
Spain
Coordinates (lat,lon):
37.440000 , -6.250000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 2 MW
  • Capacity: 7 MWh
  • Duration: 3.5 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Bavaria
Second Level
Germany
Coordinates (lat,lon):
49.690000 , 10.960000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 20.5 MW
  • Estimated Capacity: 41 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Great Britain(United Kingdom)
Region
England
Second Level
Great Britain
Coordinates (lat,lon):
52.930000 , -0.220000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 1 MW
  • Capacity: 1 MWh
  • Duration: 1 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium manganese oxide battery (LMO)

Facility

Country
Italy(Italy)
Region
Sardinia
Second Level
Italy
Coordinates (lat,lon):
40.660000 , 8.680000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 16 MW
  • Capacity: 1 MWh
  • Duration: 0.06 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Germany(Germany)
Region
Bavaria
Second Level
Germany
Coordinates (lat,lon):
47.690000 , 10.320000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to