European Commission
JRC Smart Electricity Systems

  • STATUS: Under construction
  • Power: 100 MW
  • Estimated Capacity: 2000 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
RHEINE(Germany)
Second Level
RHEINE
Coordinates (lat,lon):
52.482557 , 7.299668
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Permitted
  • Power: 180 MW
  • Estimated Capacity: 3600 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
VALLE DE MENA(Spain)
Second Level
VALLE DE MENA
Coordinates (lat,lon):
43.233837 , -2.750072
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Permitted
  • Power: 20 MW
  • Estimated Capacity: 400 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
VALLE DE MENA(Spain)
Second Level
VALLE DE MENA
Coordinates (lat,lon):
43.233837 , -2.750072
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Operational
  • Power: 1.6 MW
  • Estimated Capacity: 32 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
SAILLAT-SUR-VIENNE(France)
Second Level
SAILLAT-SUR-VIENNE
Coordinates (lat,lon):
45.873089 , 0.833452
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Operational
  • Power: 1 MW
  • Estimated Capacity: 20 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
VILA FRANCA DE XIRA(Portugal)
Second Level
VILA FRANCA DE XIRA
Coordinates (lat,lon):
39.012545 , -8.953810
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Under construction
  • Power: 16 MW
  • Estimated Capacity: 320 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
MANA(France)
Second Level
MANA
Coordinates (lat,lon):
5.668733 , -53.778404
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
Subscribe to