European Commission
JRC Smart Electricity Systems

  • STATUS: Announced
  • Power: 30 MW
  • Estimated Capacity: 60 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Great Britain(United Kingdom)
Region
Scotland
Second Level
Great Britain
Coordinates (lat,lon):
57.580000 , -5.070000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 0.15 MW
  • Estimated Capacity: 3 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
IBBENBÜREN(Germany)
Second Level
IBBENBÜREN
Coordinates (lat,lon):
52.274200 , 7.716700
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
  • STATUS: Operational
  • Power: Non-relevant
  • Estimated Capacity: 0.06 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
ZARAGOZA(Spain)
Second Level
ZARAGOZA
Coordinates (lat,lon):
41.648900 , -0.877800
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
Note: "Non relevant" means under 0.01 MW(h)
  • STATUS: Operational
  • Power: 0.02 MW
  • Estimated Capacity: 0.42 MWh
  • Duration: 20 hours
  • Units: 1
Technology and subtechnology
CHEMICAL | Power to Gas (H2)

Facility

Country
BAD LAASPHE(Germany)
Second Level
BAD LAASPHE
Coordinates (lat,lon):
50.133300 , 8.933300
Disclaimer: The information displayed about this project has been obtained from the International Energy Agency (IEA).
Subscribe to