European Commission
JRC Smart Electricity Systems

  • STATUS: Permitted
  • Power: 100 MW
  • Estimated Capacity: 200 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Italy(Italy)
Region
Apulia
Second Level
Italy
Coordinates (lat,lon):
41.300000 , 15.480000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Under construction
  • Power: 200 MW
  • Capacity: 400 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Great Britain(United Kingdom)
Region
Scotland
Second Level
Great Britain
Coordinates (lat,lon):
55.930000 , -4.370000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 149.7 MW
  • Capacity: 1122.75 MWh
  • Duration: 7.5 hours
  • Units: 3
Technology and subtechnology
THERMAL | Molten salts (Sensible Thermal Energy Storage (STES))

Facility

Country
Spain(Spain)
Region
Andalusia
Second Level
Spain
Coordinates (lat,lon):
37.360000 , -4.540000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 20 MW
  • Estimated Capacity: 40 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Poland(Poland)
Region
Opole
Second Level
Poland
Coordinates (lat,lon):
50.850000 , 17.440000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 50 MW
  • Estimated Capacity: 100 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Sweden(Sweden)
Region
Sodermanland
Second Level
Sweden
Coordinates (lat,lon):
58.990000 , 16.210000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 0.2 MW
  • Capacity: 0.8 MWh
  • Duration: 4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Redox flow batteries Vanadium

Facility

Country
Great Britain(United Kingdom)
Region
England
Second Level
Great Britain
Coordinates (lat,lon):
53.730000 , -2.240000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 4.08 MW
  • Capacity: 8.17 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Saxony
Second Level
Germany
Coordinates (lat,lon):
51.570000 , 13.100000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to