European Commission
JRC Smart Electricity Systems

  • STATUS: Operational
  • Power: 100 MW
  • Capacity: 750 MWh
  • Duration: 7.5 hours
  • Units: 2
Technology and subtechnology
THERMAL | Molten salts (Sensible Thermal Energy Storage (STES))

Facility

Country
Spain(Spain)
Region
Castile-La Mancha
Second Level
Spain
Coordinates (lat,lon):
39.670000 , -3.270000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 20 MW
  • Capacity: 40 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Lower Saxony
Second Level
Germany
Coordinates (lat,lon):
52.190000 , 10.450000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 10 MW
  • Capacity: 53 MWh
  • Duration: 5.3 hours
  • Units: 1
Technology and subtechnology
THERMAL | Unspecific Sensible Thermal Energy Storage (STES)

Facility

Country
Spain(Spain)
Region
Castile-La Mancha
Second Level
Spain
Coordinates (lat,lon):
40.480000 , -3.360000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 80 MW
  • Estimated Capacity: 112 MWh
  • Duration: 1.4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Great Britain(United Kingdom)
Region
Scotland
Second Level
Great Britain
Coordinates (lat,lon):
55.910000 , -2.510000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 1.5 MW
  • Capacity: 3.51 MWh
  • Duration: 2.34 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Germany(Germany)
Region
Baden-Wurttemberg
Second Level
Germany
Coordinates (lat,lon):
49.100000 , 8.540000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 9 MW
  • Capacity: 4.5 MWh
  • Duration: 0.5 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Great Britain(United Kingdom)
Region
England
Second Level
Great Britain
Coordinates (lat,lon):
51.470000 , 0.340000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to