European Commission
JRC Smart Electricity Systems

  • STATUS: Operational
  • Power: 0.9 MW
  • Capacity: 0.57 MWh
  • Duration: 0.63 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium nickel cobalt aluminium oxide battery (NCA)

Facility

Country
Italy(Italy)
Region
Sicily
Second Level
Italy
Coordinates (lat,lon):
37.900000 , 13.560000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 60 MW
  • Capacity: 120 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Switzerland(Switzerland)
Region
Grisons
Second Level
Switzerland
Coordinates (lat,lon):
46.810000 , 9.400000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 100 MW
  • Estimated Capacity: 200 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Great Britain(United Kingdom)
Region
England
Second Level
Great Britain
Coordinates (lat,lon):
53.820000 , -1.860000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Inactive
  • Power: 10 MW
  • Capacity: 10 MWh
  • Duration: 1 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Great Britain(United Kingdom)
Region
England
Second Level
Great Britain
Coordinates (lat,lon):
51.790000 , 0.560000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 75 MW
  • Capacity: 300 MWh
  • Duration: 4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Poland(Poland)
Region
Silesian
Second Level
Poland
Coordinates (lat,lon):
50.440000 , 18.780000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 1800 MW
  • Estimated Capacity: 14400 MWh
  • Duration: 8 hours
  • Units: 2
Technology and subtechnology
MECHANICAL | Pumped Hydro Storage (PHS)

Facility

Country
United Kingdom
Region
Scotland
Coordinates (lat,lon):
56.650000 , -3.910000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Under construction
  • Power: 50 MW
  • Capacity: 100 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Poland(Poland)
Region
Opole
Second Level
Poland
Coordinates (lat,lon):
50.670000 , 17.920000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to