European Commission
JRC Smart Electricity Systems

  • STATUS: Operational
  • Power: 150 MW
  • Capacity: 640 MWh
  • Duration: 4.27 hours
  • Units: 2
Technology and subtechnology
MECHANICAL | Pumped Hydro Storage (PHS)

Facility

Country
Bulgaria
Region
Pazardzhik
Coordinates (lat,lon):
42.200000 , 23.860000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 30 MW
  • Capacity: 60 MWh
  • Duration: 2 hours
  • Units: 2
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Latvia(Latvia)
Region
Riga
Second Level
Latvia
Coordinates (lat,lon):
56.960000 , 24.100000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 150 MW
  • Capacity: 1275 MWh
  • Duration: 8.5 hours
  • Units: 3
Technology and subtechnology
THERMAL | Molten salts (Sensible Thermal Energy Storage (STES))

Facility

Country
Spain(Spain)
Region
Andalusia
Second Level
Spain
Coordinates (lat,lon):
37.360000 , -4.540000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 60 MW
  • Capacity: 120 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Italy(Italy)
Region
Lazio
Second Level
Italy
Coordinates (lat,lon):
42.420000 , 12.100000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 432 MW
  • Capacity: 4285 MWh
  • Duration: 9.92 hours
  • Units: 2
Technology and subtechnology
MECHANICAL | Pumped Hydro Storage (PHS)

Facility

Country
Spain(Spain)
Region
Castile and Leon
Second Level
Spain
Coordinates (lat,lon):
41.210000 , -6.690000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to