European Commission
JRC Smart Electricity Systems

  • STATUS: Announced
  • Power: 3.75 MW
  • Capacity: 7.5 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Germany(Germany)
Region
Bavaria
Second Level
Germany
Coordinates (lat,lon):
48.540000 , 11.090000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Permitted
  • Power: 5.93 MW
  • Capacity: 23.7 MWh
  • Duration: 4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Poland(Poland)
Region
Silesian
Second Level
Poland
Coordinates (lat,lon):
50.200000 , 18.310000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 220 MW
  • Capacity: 1760 MWh
  • Duration: 8 hours
  • Units: 4
Technology and subtechnology
MECHANICAL | Pumped Hydro Storage (PHS)

Facility

Country
Germany(Germany)
Region
Baden-Wurttemberg
Second Level
Germany
Coordinates (lat,lon):
47.690000 , 8.250000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 4 MW
  • Capacity: 16 MWh
  • Duration: 4 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Unspecific Storage battery

Facility

Country
Poland(Poland)
Region
Silesian
Second Level
Poland
Coordinates (lat,lon):
50.490000 , 19.420000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Operational
  • Power: 11 MW
  • Capacity: 22 MWh
  • Duration: 2 hours
  • Units: 1
Technology and subtechnology
ELECTROCHEMICAL | Lithium-ion batteries

Facility

Country
Great Britain(United Kingdom)
Region
England
Second Level
Great Britain
Coordinates (lat,lon):
51.410000 , 0.330000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
  • STATUS: Announced
  • Power: 10 MW
  • Capacity: 48 MWh
  • Duration: 4.8 hours
  • Units: 1
Technology and subtechnology
THERMAL | Unspecific Sensible Thermal Energy Storage (STES)

Facility

Country
Spain(Spain)
Region
Navarre
Second Level
Spain
Coordinates (lat,lon):
42.610000 , -1.830000
Disclaimer: The information displayed about this project has been obtained from the dataset provided by Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.
Subscribe to