Distributed Energy Resources Test Facility (DER-TF)
- Static Equipment:PV fieldsDescription: different PV fields with different inverters single phase, three phase, microinverter with an overall capacity of 36 kWpCHP Internal Combustion engine #1Description: Viessmann Vitobloc 200 EM-50/81 engine with synchronous generator (
- Mobile Equipment:Portable Electric Power Quality AnalyzerDescription: Teamware Wally IP; Network analyzer for monitoring the quality of electric service. Approved according to ENEL DI 2201specifications. 5 Instruments.
- Technologies for the integrated grid:Don't know/No answer
- Work on microgrids: Do you work on microgrids? No
- Do you work with PMUs? No
- Do you work on AMI? No
- Technologies for Customers and Market:Don't know/No answer
- Technologies for energy storage:Don't know/No answer
- Technologies for generation:Don't know/No answer
- Power and voltage capabilities:
- AC
- DC
- Total power installed (kW):
- Peak power of the installed equipment(kW)
- Voltage level (V))
- Hardware in the Loop and Real Time simulations Do you work with Real Time Simulator? No
- Testing Services:DER Generators (RES and CHP) test including energetic performance, interoperability, local and remote control and electrical compatibility with other components• Batteries and storage systems tests including systems performance, interoperability, renewabl