220 kV SSSC device for power flow control

Start and end dates:
January, 2009 to December, 2014
Project website:
Prevailing Stage of Development:
Demonstration
Brief description and/or other information regarding the project:
Design. construct. set up in operation and test a FACTS (SSSC) to prevent overload situations in the 220 kV transmission grid and reduce the measures that the System Operator has to make for solving overloads. like reduce the meshing of the network or curtail wind production.
Project full name:
Design, development and test in the Spanish transmission network
Countries involved:
Project Main Application:
Smart Network Management
Leading Organisation(s):