Project full name:
Pilot project of Smart Grid deployment at ENERGA-OPERATOR SA
The main objective of the Smart Grid pilot project in the Hel Peninsula is to check its basic elements and to develop an implementation concept for similar projects across ENERGA-OPERATOR SA. It has been assumed that the scope of the project should include medium and low voltage grids. Subject to checking – by way of practical implementation – are project elements such as: ? central part - IT system integrated with SCADA at the Regional Power Dispatch level, ? telecommunication infrastructure, ? automation, control, and measuring equipment in MV and LV grids, ?